\chapter{Distributed~computing~and~the~\grid}
%Latchezar Betev <latchezar.betev@cern.ch>, the editor of this chapter.
\label{CH:Distributed_computing_and_the_GRID}

\section{Introduction}

The ALICE computing model assumes the existence of a functional \grid
middleware allowing for efficient, seamless, and democratic access to
worldwide-distributed heterogeneous computing and storage
resources. The technical feasibility of this assumption has been
demonstrated during the series of Physics Data Challenges (PDCs) in
2003 and 2004 with the ALICE-developed \alien~\cite{CH3Ref:alien}
system.

Our current plan is to build a similar system making maximum usage of
the common \grid services deployed by LCG~\cite{CH3Ref:lcg}
and adding the necessary
ALICE-specific services derived from the \alien system.

The experience gained during the data challenges strongly supports a
\grid model with minimum of intrinsic hierarchy and specific resources
categories. Intelligent workload scheduling based on the advertised
features of the computing resources and on the job requirements allows
for a better utilisation of the resources with respect to a fixed
hierarchy. However, for clarity and to account for the possibility to
have less advanced \grid services, the foreseen computational tasks
and classes are categorized below in a manner that caters to a more
commonly accepted `tiered' distributed computing centre architecture.

The tier structure allows for a layered classification whereby,
depending on the type of computational tasks, tasks are assigned to a
computing element with a specific functionality. However, it also
introduces a more rigid access to the resources, requiring a higher
level of central management and thus increases the overall cost of the
final system in terms of CPU, storage and manpower.

In this chapter a short description of the ALICE distributed computing
environment is presented, with emphasis on the ALICE view of a
decentralized \grid structure with advanced functionality. Owing to
the rapid evolution of the \grid, it is expected that the distributed
computing environment will undergo several modifications, especially
in the area of the \grid implementation details.

\section{Distributed computing}
\label{SEC:Distributed_computing}

The ALICE computing model is driven by the consideration of the large
amount of computing resources which will be necessary to store and
process the data generated by the experiment. Detailed description of
the data sizes under different data-taking scenarios are given in
Chapter~\ref{CH:Computing_model_and_capacity_requirements}.

Since the conceptual design of the LHC~\cite{CH3Ref:lhc} experimental programme, it was
recognized that the required data processing and storage resources
cannot be consolidated at a single computing centre. It is more
natural, considering both the substantial financial investment
involved and the need for expert human resources, that these resources
are distributed at the HEP computing facilities of the institutes and
universities participating in the experiment. The technical side of
the decentralized offline computing scenario has been formalized in
the so-called MONARC model~\cite{CH3Ref:monarc} schematically shown in
Fig.~\ref{CH3Fig:monarc}. MONARC describes an assembly of distributed
computing resources, concentrated in a hierarchy of centres called
Tiers, where Tier~0 is CERN, Tier~1s are the major computing centres
which provide a safe data storage, likely in the form of a mass
storage system (MSS), Tier~2s are smaller regional computing
centres. The MONARC model also foresees Tier~3s which are university
departmental computing centres and Tier~4s that are user
workstations; however the distinction of these lower Tiers is not
relevant in a \grid model.  The major difference between the first
three Tiers is the quality of service (QoS) and reliability of the
computing resources at every level, where the highest QoS is offered
by the Tier~0/Tier~1 centres. At the moment of publication of this
document, the QoS metrics associated to the different Tiers are still
under discussion.

\begin{figure}[tbh]
\centering
\includegraphics[width=13cm]{chap3fig/monarc_alice_mc.eps}
\caption{Schematic view of the ALICE offline computing tasks in
the framework of the tiered MONARC model. The acronyms are explained
in the text.}
\label{CH3Fig:monarc}
\end{figure}

The basic principle underlying the ALICE computing model is that every 
physicist should have equal access to the data and the computing resources
necessary for its processing and analysis. Thus, the resulting system will 
be very complex with hundreds of components at each site with several 
tens of sites. A large number of tasks will have to be performed in parallel, 
some of them following an ordered schedule, for example the raw data 
reconstruction, large \MC production, data filtering and stripping, 
and some being largely unpredictable: single-user \MC production 
and data analysis. In order to be used efficiently, the distributed computing and 
storage resources will have to be transparent to the end user, essentially 
looking like a single entity.

The commonality of distributed resources management is being realized under 
the currently ongoing development of the \grid ~\cite{CH3Ref:GRID}. It was
conceived to facilitate the development of new applications based on
high-speed coupling of people, computers, databases, instruments, and
other computing resources by allowing ``dependable, consistent,
pervasive access to high-end resources''. Although the MONARC model
pre-dates the appearance of the \grid concept, its terminology is well
adapted to the distribution of resources that are present in the HEP
community and remains very useful for discussing the  organization and relations 
of the centres. In this document, we shall consider only Tier~0, Tier~1 and 
Tier~2 functionality.

However, in a well functioning \grid, the distribution of tasks to the
various computing centres will be performed dynamically, based on the
availability of resources and the services that they advertise,
irrespective of the assigned Tier level. This picture is an
evolution of the MONARC structure, since it is more flexible and
allows for a better optimisation of resource usage. This Tier-free
model is sometimes called `Cloud Model' and it has been adopted as
a concept in the development of the \alien system and used to exploit
the computing capacities offered by the computing centres
participating in the ALICE \grid during the Physics Data Challenges.

The ALICE computing model foresees that one copy of the raw data from
the experiment will be stored at CERN (Tier~0) and a second copy will
be distributed among the external (i.e. not at CERN) Tier~1 centres,
thus providing a natural backup. Reconstruction to the Event Summary Data (ESD)
level will be shared by the Tier~1 centres, with the CERN Tier~0 responsible 
for the first reconstruction pass. Subsequent data reduction to the Analysis
Object Data (AOD) level, analysis and \MC production will be a collective 
operation where all Tier~1 and 2 centres will participate. 
The Tier~1s will perform 
reconstruction and scheduled analysis, while the Tier~2s will perform 
\MC and end-user analysis.

\grid technology holds the promise of greatly facilitating the
exploitation of LHC data for physics research and ALICE is very active
on the different \grid test-beds and worldwide projects~\cite{CH3Ref:lcg}, 
\cite{CH3Ref:egee}, where \grid
middleware prototypes are deployed. The objective of this activity is
to gain experience with all systems, representing a reasonable amount
of computing resources, and ultimately assemble a computing environment
which is able to fulfil the collaboration needs in terms of offline
data production and analysis.

This activity, both very useful and interesting in itself, is faced
with the different levels of maturity and functionality of the
deployed middleware and its various flavours emerging from different
\grid projects and communities. Any middleware currently available is
largely a result of leading-edge computer science research and is
therefore still rather far from production quality. Moreover, there
are no commonly adopted inter-\grid communication standards and the
development in different projects is following very different paths
and software standards, even if the functionality which is aimed at is
very similar.

The emerging heterogeneous picture is rather unfavourable, since the 
computing resources to be exploited by the experiments like ALICE are
presented in the form of non-conformal \grid implementations. In addition, 
owing to the multitude of projects working independently on a solution to 
essentially the same problems, the most complex tasks to be executed 
on the \grid, e.g. distributed data analysis, cannot be adequately 
addressed.    

Faced with this situation, the LHC experiments are developing a very
similar approach, although on parallel lines. They are planning to
deploy services offering a homogeneus view of the Virtual Organisation
corresponding to the experiment, while these services are in turn
interfaced to the different \grid flavours deployed on the resources
offered to the experiment by the funding agencies. In a non-dissimilar
way, ALICE is planning to use some of the \alien services to interface
with the different Grids. It is of course in the best of ALICE's
interest to minimise the amount of experiment specific services that
we will have to deploy and maintain ourselves, maximising the use of
the common \grid services deployed and maintained by the computing
centres.

\section{\alien, the ALICE interface to the \grid}

The \alien ({\bf Ali}CE {\bf En}vironment)
framework has been developed with the aim of offering to the ALICE
user community a transparent access to computing resources distributed
worldwide through a single interface. During the years \mbox{2001--2004}
\alien has provided a functional computing environment fulfilling the
needs of the experiment in its preparation phase. \alien was
primarily conceived as the ALICE user entry point into the \grid
world, shielding the users from its underlying complexity and
heterogeneity. Through interfaces, it can use transparently resources
of different Grids developed and deployed by other groups. This
advanced concept has been successfully demonstrated during the ALICE
Physics Data Challenge '04 (PDC'04), where the resources of the LCG
and INFN Grids were accessed through interfaces.  Approximately
11$\%$ of the computing resources used in PDC'04 were provided by the
LCG and INFN Grids.  In the future, the cross-\grid functionality 
will be extended to cover other \grid flavours. In addition, \alien 
has been engineered to be highly modular, and individual components 
can be deployed and used in a foreign \grid, which is not adapted 
to the specific computational needs of ALICE, thus achieving an 
efficient use of the available resources.

The system is built around Open Source components and uses a Web
Services model~\cite{CH3Ref:ws} and standard network protocols. 
Less than 5\% is native \alien code (mostly code in PERL), 
while the rest of the code has
been imported in the form of Open Source packages and modules. 

Web Services play the central role in enabling \alien as a distributed
computing environment. The user interacts with them by exchanging SOAP
(Simple Object Access Protocol) messages and they constantly exchange
messages between themselves behaving like a true Web of collaborating
services. \alien consists of the following components and services:
authentication, authorization and auditing services; workload and data
management systems; file and metadata catalogues; the information
service; \grid and job monitoring services; storage and computing
elements. A schematic view of the \alien services, their location and
interaction with the native services at the computing centres is
presented in Fig.~\ref{CH3Fig:alienfig2}.

\begin{figure}[b!]
\centering
\includegraphics[width=12cm]{chap3fig/alien_comp_mc.eps}
\vspace{0.05cm}
\caption{Schematic view of the \alien basic components and deployment
principles.} 
\label{CH3Fig:alienfig2}
\end{figure}

The \alien workload management system is based on the so-called
`pull' approach. A service manages a common task queue, which holds
all the jobs of the ALICE Virtual Organization (VO). On each site
providing resources for the ALICE VO, Computing Element (CE) services
act as `remote queues' giving access to computational resources that
can range from a single machine, dedicated to running a specific task,
to a cluster of computers in a computing centre, or even an entire
foreign \grid. When jobs are submitted, they are sent to the central
queue. The workload manager optimizes the queue taking into account
job requirements such as the input files needed, the CPU time and the
architecture requested, the disk space request and the user and group
quotas. It then makes jobs eligible to run on one or more computing
elements. The CEs of the active nodes get jobs from the central queue
and deliver them to the remote queues to start their execution. The
queue system monitors the job progress and has access to the standard
output and standard error.

Input and output associated with any job are registered in the \alien
File Catalogue (FC), a virtual file system in which logical names,
with a semantics similar to the Unix file system, are assigned to
files.  Unlike real file systems, the FC does not own the
files; it only keeps an association between one or possibly more
Logical File Names (LFN) and (possibly more than one) Physical File
Names (PFN) on a real file or mass storage system. The correspondance
is kept via the {\bf G}lobal {\bf U}nique file {\bf ID}entifier (GUID)
stored in the FC. The FC supports file replication and caching and it
provides the information about file location to the RB when it comes
to scheduling jobs for execution. These features are of particular
importance, since similar types of data will be stored at many
different locations and the necessary data replication is assumed to
be provided transparently and automatically by the \grid
middleware. The \alien file system associates metadata with LFNs.

ALICE has used the system for distributed production of \MC data,
reconstruction and analysis at over 30 sites on four continents.  The
round of simulation, reconstruction and analysis during the PDC'04 was
aimed at providing large amounts of simulated data for physics studies
as well as testing the main components of the ALICE computing
model. During the data challenge, more than 400~000 jobs were
successfully run worldwide from the \alien Task Queue (TQ), producing
40\,TB of data.  Computing and storage resources were available both
in Europe and the US. The amount of processing needed for a typical
production is in excess of 30~\msitwoks to simulate and digitize a
central \PbPb event.  Some 100~000 high-multiplicity
\mbox{Pb--Pb} events were generated for each major production.  This
is an average over a very large range since peripheral events may
require one order of magnitude less CPU, and \mbox{pp} events two
orders of magnitude less. The \mbox{Pb--Pb} events are then
reprocessed several times superimposing known signals, in order to be
reconstructed and analysed. Again there is a wide spread in the time
this takes, depending on the event, but for a central event this needs
a few \msitwoks.  Each \mbox{Pb--Pb} central event occupies about 2~GB
of disk space, while \mbox{pp} events are two orders of magnitude
smaller. The total amount of CPU work during PDC'04 was 750
\msitwokh. The relative contribution of the computing centres,
participating in the ALICE \grid during PDC'04 is shown in
Fig.~\ref{CH3Fig:alienfig6}.

\begin{figure}[b!]
\centering
\includegraphics[width=15cm]{chap3fig/jobcpu_contrib.eps}
\vspace{0.05cm}
\caption{Relative CPU and storage contribution by the participating sites during the PDC'04.} 
\label{CH3Fig:alienfig6}
\end{figure}

The \grid user data analysis has been tested in a limited scope using
tools developed in the context of the ARDA project~\cite{CH3Ref:ARDA}
(the gShell interface to the FC and the analysis tools based on it).
Two approaches were prototyped and demonstrated: the asynchronous
(interactive batch approach) and the synchronous (true interactive)
analysis.

The asynchronous model has been realized by extending the \ROOT \cite{CH3Ref:root} 
functionality to make it \grid-aware. As the first step, the analysis
framework has to extract a subset of the datasets from the file
catalogue using metadata conditions provided by the user. The next part
is the splitting of the tasks according to the location of datasets.
Once the distribution is decided, the analysis framework splits the
job into sub-jobs and inserts them in the \alien TQ with precise job
descriptions. These are submitted to the local CEs for
execution. Upon completion, the results from all sub-jobs are
collected, merged and delivered to the user. This model has been shown
to work with satisfactory results, but more attention has to be
devoted to the optimisation of the load on the FC, when many
simultaneous large user queries are performed and the fault-tolerance
of the merging mechanism when some of the sub-jobs fail.

\begin{figure}[t]
\centering
\includegraphics[width=11.5cm]{chap3fig/alienfig7.eps}
\caption{Setup and interaction with the \grid middleware of a user 
PROOF session distributed over many computing centres.} 
\label{CH3Fig:alienfig7}
\end{figure}

The synchronous analysis model requires a much tighter integration
between \ROOT and the \grid services, where the framework should be
able to execute in parallel and in real-time all sub-jobs associated
to the main user job. In addition, the system should automatically
scale the number of running processes to the amount of available
resources at the time of execution. The model relies on extending the
functionality of PROOF~\cite{CH3Ref:proof} -- the Parallel \ROOT
Facility. The PROOF interface to \grid-like services is presently
being developed, focusing on authentication and the use of the FCs,
in order to make both accessible from the \ROOT shell.

In the conventional, single-site setup, PROOF workers are managed by a
PROOF master server, which distributes tasks and collects results. In
a multi-site setup, each site running a PROOF environment will be seen
as a PROOF worker for a PROOF master running on the user machine.  The
PROOF master has therefore to implement the functionality of a master
and a worker at the same time. This concept is illustrated in
Fig.~\ref{CH3Fig:alienfig7}. \alien classes used for asynchronous
analysis as described earlier can be used for task splitting in order
to provide the input data sets for each site that runs PROOF locally.

The \alien-PROOF-based system for distributed synchronous analysis
will be used for a rapid evaluation of large data samples in a
time-constrained situation, for example the evaluation of the detector
calibration and alignment at the beginning of a data-taking
period. This will allow for an efficient planning of critical analysis
tasks, where the predictability of the execution time is very
important. As such it is an essential building block of the ALICE
computing model.

\section{Future of the \grid in ALICE}

The experience with the \alien \grid middleware has been instrumental in
shaping the ALICE computing model. The technical feasibility of a
functional \grid, effectively managing thousands of processors and
hundreds of terabytes of storage, distributed over many computing
centres worldwide has been demonstrated in a series of realistic
Physics Data Challenges. These were conceived and executed with
parameters closely approximating the real running conditions of the
ALICE experiment.

One of the most important requirements for the efficient use of the \grid 
is the existence of a single interface to the computing resources, 
effectively shielding the end user from the underlying software and
hardware complexity. In the past several years this role has been played 
by \alien acting as a complete vertical \grid system.

During this time, different \grid solutions developed by large
collaborations, have come to maturity. However, as explained before,
two major issues still remain. First of all, none of these \grid
flavours provides a complete solution for the ALICE computing model,
and secondly there are no accepted standards, and all these Grids
provide a different user interface and a diverse spectrum of
functionality.

Therefore some of the \alien services will continue to be used as the
ALICE's single point of entry to the computing resources encapsulated by
the various \grid entities and as a complement of their
functionality to implement the ALICE computing model. In this model,
which has already been prototyped and used, the foreign \grid will be
accessed via interfaces. The elements of \alien used in synergy with
the deployed \grid middleware to supplement its functionality will
assure efficient use of the computing resources. The cross-\grid role
of \alien preserves the present ALICE infrastructure and user access
methods and allows for its continuous development and enrichment with
advanced functionalities. It also provides the necessary methods for
addition of computing resources and adoption of new \grid standards as
they become available.

The ALICE Computing Project will closely watch the evolution of the
functionality of the deployed \grid middleware and of the
international \grid standards. Whenever a standard \grid service is
found to provide the same, or better, functionality than an
ALICE-specific one, its adoption will be considered in order to reduce
the maintenance load and increase portability and robustness of the
ALICE computing environment.